Product Description
Mineral Water pet Bottle Blow Molding machine
Model:Eceng Q9000
Product Parameters
Item |
Q9000 |
Bottle type specification |
Cavity |
6 |
Theory output |
9000 |
Max.volume |
2L |
Bottle mouth maximum overall diameter |
28-38mm |
Bottle biggest diameter |
100mm |
Bottle maximum height |
330mm |
Power specifications |
Light tube quantity |
32pcs |
Light tube power |
1.25KW |
Maximum heating power |
40KW |
All electric machine installation |
43KW |
Actual consumption |
30.1KW |
Air pressure specification |
Work pressure |
7-9kg/c |
Low-pressure gas consumption |
1600L/min |
Blow bottle pressure |
25-35kg/c |
Higher -pressure gas consumption |
4000Ltr/min |
Forzen water specification |
Work pressure |
5-6 kg/c |
Temperature range |
10ºC |
Consumption |
8000kcal/hr |
Forzen water flow |
88L/min |
Machine specification |
Size of the machine |
6.5x1.5x1.9 |
Weight of the machine |
4ton |
Technology Advantage
l. Special design,high rigid compound die structure
2. Wide adaptability, suitable for every type mould thickness
3. Adjust convenience
4. No mould rolling out
5. More energy conservation,no need much air supply
6. High burnish principal axis, with very precise polishing, light action and low noise.
7. Short mould stroke,quick action
8. All ZG45 casting, with long timing process,very small transformation,can meet your precise request 100%
9. Hig dead-weigh, ensure the steady during the opeartion
Technical Team
With Customers
FAQ
Q1:Are you a trading company or a manufacturer?
A1:We have our own factory for 10 years,will try our best to provide you service .
Q2:What's your guarantee or the warranty of the quality if we buy your machines?A2:We offer you high quality machines with 1 year guarantee . we will give u spare part free in 1 year,
Life long after service. Mean while, our engineers can go to your factory assist you installing and testing machine to normal working condition.we also have a technical team support for after service.
Q3:When can I get my machine after I paid?
A3:We will deliver the machines on time as the date we agreed both side.
Q4:How can I install my machine when it arrives?
A4:We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the machines.
Q5:What's the delivery time?
A5:45 days after the T/T deposit or L/C.
warmly welcome to visit our factory!